The Malvern Garage Hoist Replacement project consisted of the removal and disposal of ten (10) existing standard 2-post bus hoists and the installation of ten (10) brand new standard scissor bus hoists. The removal and replacement was completed within an existing operational maintenance facility. Maystar made all the necessary structural, mechanical, and electrical modifications to accommodate the new standard length scissor bus hoists in accordance with the specification and drawings.